Tappan Zee Bridge

CTLGroup was retained by Tappan Zee Constructors, LLC to perform concrete mixture development and laboratory testing, concrete durability analysis, and mass concrete analysis. Following the results of the testing, CTLGroup was also contracted to provide service life evaluations of hardened concrete properties and thermal control recommendations.

CTLGroup evaluated multiple concrete placements, reviewing the raw temperature data provided and comparing the temperature differences against the allowable difference, and reported whether any placement exceeded the maximum temperature limit of 35°F, or required further examination for thermal cracking.

Our team also provided assistance pertaining to concrete and construction troubleshooting, changes to specifications, and other miscellaneous consulting services.

Markets

Civil Infrastructure

Transportation

Consulting Services

Concrete Mixture Development & Qualification

Durability & Service Life

Mass Concrete & Thermal Control

Materials Science + Engineering

Laboratory Services

Concrete + Cement-Based Materials

Durability & Service Life Testing

1,000 steel pipe piles will be installed in the river to support the foundation of the crossing.

192

Number of Stay Cables

4, 962

Hours Worked

3.1

Length in Miles