Chesapeake Bay Bridge Tunnel

CTLGroup was retained by Titan Virginia Ready-Mix and Dragados USA to provide on-site and laboratory qualification services for concrete mixtures and to provide technical and mass concrete consulting services for the approach structure slurry walls and base slab of the tunnel, which requires a service life of 100-years. Our firm was also asked to prepare thermal control plans for the newly constructed two-lane tunnel under Thimble Shoal Channel.

We evaluated durability indicators to assess the performance of concrete to be placed during construction. This included compressive strength, freeze-thaw resistance, chloride penetration resistance, inverse carbonation resistance, and water-soluble chlorides. In addition, we evaluated the elastic modulus and coefficient of thermal expansion in order to allow for performance-based temperature difference limits for thermal control of mass concrete placements.

Markets

Civil Infrastructure

Transportation

Consulting Services

Concrete Mixture Development & Qualification

Durability & Service Life

Project Specification Review & Development

Mass Concrete & Thermal Control

Materials Science + Engineering

Laboratory Services

Concrete + Cement-Based Materials

Chemical Services

Durability & Service Life Testing

Physical Testing of Concrete + Mortar

Specialized Testing

The Chesapeake Bay Bridge–Tunnel has been crossed by more than 130 million vehicles as of May 2018.

1,964

Hours Worked

134

Maximum Feet Below Water Surface

42,000

Cubic Yards of Concrete