SH 360 Project

CTLGroup was retained by Balcones Geotechnical to perform a pavement evaluation and preliminary pavement design for the SH 360 project for the HDR/Balfour Battey team. Scope of work included document review and a structural and functional evaluation of the existing continuously reinforced concrete pavement and pavement thickness designs for main lanes, frontage roads, cross streets and temporary roadways. Deflection and profile testing was conducted and analyzed to assess the remaining life of the pavements and develop a maintenance and rehabilitation plan. Coring was conducted to verify pavement thickness and material properties. TXDOT TSLAB software was utilized for the CRCP pavement designs during the proposal phase. Designs were conducted for a range of traffic loading conditions and subgrade soil conditions.

Markets

Materials & Products

Transportation

Consulting Services

Project Specification Review & Development

Materials Science + Engineering

Laboratory Services

Concrete + Cement-Based Materials

State Highway 360 or SH 360 is located in the  Dallas–Fort Worth Metroplex and spans a 28.00-miles, north to south.

156

Hours Worked

27.997

Length (Miles)

1955

Year Designated

Learn more about this project

Project Detail Form

Project Detail Form