CTLGroup performed field investigation work in the East Filter Building at the Jardine Water Purification Plant beginning in May 2008. Field work included a visual survey of the channel slab undersides performed from walkway areas between the settling basins and filter beds. Supplemental high-intensity lighting was utilized during the surveys. Accessible underside areas of the channel slabs were reviewed in the north and south buildings. Surveys revealed areas where channel slabs exhibited deterioration, predominantly cracking and spalling, in the flange areas due to corrosion of flange reinforcement. Surveys also revealed areas where channel slabs exhibited damage due to topside penetrations and/or impact. CTLGroup reported these findings and made repair recommendations.

Markets

Water and WasteWater

Consulting Services

Comprehensive Building Assessment

Structural Engineering + Evaluation

Structural Condition Assessment

Structural Health Monitoring

The James Jardine Water Filtration Plant is the largest water treatment plant in the world

2011

Project Completion

1968

Plant Opening

5.5 M

People Served