Evanston Library Weatherproofing

CTLGroup conducted an evaluation into the weatherproofing of the North Branch of the Evanston Library, as well as the compliance of the existing front entrance of the Evanston North Branch Library to the requirements of the Illinois Accessibility Code. The evaluation included visual observation and measurements of the physical conditions at the front entry and a careful review of the Illinois Accessibility Code (IAC).

CTLGroup specified re-pointing the existing brick removal & replacement of the old windows with new aluminum frame double hung windows. The entry vestibule was updated with new doors, with ADA compliant operators.

The existing structure in the storefront windows was replaced, with the existing storefront itself being removed and replaced with a storefront knee wall that was rebuilt. Repairs also included the removal & replacement of the stucco and cladding. New lintel stones were installed above the storefront at the entrance, the old interior floor finish was removed and abated, and new carpet was installed. The project was completed within a short time frame to limit the time that the library was closed and was completed within budget.

Markets

Buildings & Facilities

Consulting Services

Building Science

Building Enclosure

Comprehensive Building Assessment

Coatings, Adhesives, and Sealants

Structural Engineering + Evaluation

Non-Destructive Evaluation

Repair, Restoration, Retrofit

Structural Condition Assessment

The Evanston Public Library aims to provide equitable access to technological, intellectual, cultural, and information resources by acting as the heart of the diverse community of Evanston, Illinois.

575

Hours Worked

1873

Year Library Established

1937

Year North Branch Built