Related Markets
Other Services
Mass Concrete and Power Generation
Construction for new power generation facilities, whether it's wind, solar, geothermal, coal, gas or nuclear, often involves massive concrete placements.
Owners expect concrete structures to have minimal cracking and a long service life. Decisions and practices prior to and during construction determine whether or not the concrete of such placements crack and can also affect whether or not the concrete achieves the desired service life.
John Gajda, Senior Principal Engineer, and Jon Feld, Materials Consulting, at CTLGroup, co-authored this article, which appeared in the "What Works" section of the November 2011 issue of Power Engineering.
Source: Power Engineering
Other Insights by this person
- John Gajda Presents Webinar for NCSEA
June 20, 2013 - Precooling Mass Concrete with Liquid Nitrogen
July 6, 2012 - John Gajda Speaks at DOT Technology Symposium
May 17, 2012 - Gajda Presents at Electric Power Conference & Exhibition in Rosemont, IL
May 11, 2011 - Gajda co-teaches Concrete Session at a 3 day Formwork Course
April 9, 2010 - Mass Concrete for Buildings and Bridges
January 1, 2007 - Engineering Mass Concrete Structures
January 1, 2006 - Precooling Mass Concrete
August 1, 2005 - Energy Efficiency of Concrete Homes
June 1, 2005 - HVAC Sizing Software for Concrete Homes
June 1, 2005 - Great Thickness Requires Great Lengths
January 1, 2005 - Cement Plant Burns Refuse in Commercial-Scale Demo
October 1, 2004 - Save Time and Money on Mass Concrete Construction
September 1, 2003 - Controlling Temperatures in Mass Concrete
January 1, 2002