CLIENTS & PROJECTS

CTLGroup has a history of big impacts. We have achieved that by routinely combining our expertise with that of industry leaders we are fortunate to call our clients. Together, we find answers on projects where even finding the right questions can be elusive. Every collaboration builds our knowledge base. That, in turn, informs each new assignment we undertake. Building Knowledge. Delivering Results. It is more than just a tag line. It is why our clients come to us to work with them to solve some of the most complex problems they will ever face.

Our Clients

  • Holcim
  • Mintz, Levin, Cohn, Ferris, Glovsky and Popeo PC
  • NOVA Chemicals
  • Louisiana DOTD
  • HDR

Our ProjectsSEARCH PROJECT ARCHIVESSEARCH PROJECT ARCHIVES

  • Buildings & Facilities
  • Emergent Solutions
  • Energy & Resources
  • Green Solutions
  • Litigation & Insurance
  • Materials & Products
  • Transportation
  • Water & Wastewater
Buildings & Facilities
Performance Monitoring of Retractable Roof

Performance Monitoring of Retractable Roof

CTLGroup performed a long term performance monitoring of the retractable roof viscous-damper system movement at Safeco Field in Seattle, Washington.

See Project
Parking Structure Load Test

Parking Structure Load Test

CTLGroup examined a shopping mall parking structure to address issues of cracking and spalling.

See Project
New York City High Risk Construction Oversight (HRCO)

New York City High Risk Construction Oversight (HRCO)

CTL Engineers & Construction Technology Consultants, P.C. developed recommendations to the NYC construction industry to improve safety.

See Project
Frank Lloyd Wright’s Reinforced-Concrete Temple

Frank Lloyd Wright’s Reinforced-Concrete Temple

CTLGroup developed a rehabilitation plan for this historical landmark.

See Project
↑Back to Top
Emergent Solutions
Hale Boggs Memorial (Luling) Bridge Stay-Cable Replacement Design

Hale Boggs Memorial (Luling) Bridge Stay-Cable Replacement Design

CTLGroup prepared final design plans for the first-ever, complete stay-cable replacement project in North America.

See Project
Burj Khalifa, the Tallest Building in the World

Burj Khalifa, the Tallest Building in the World

CTLGroup conducted creep and shrinkage testing critical for the structural analysis of Burj Khalifa.

See Project
New York City High Risk Construction Oversight (HRCO)

New York City High Risk Construction Oversight (HRCO)

CTL Engineers & Construction Technology Consultants, P.C. developed recommendations to the NYC construction industry to improve safety.

See Project
Chimney Fire Damage Assessment

Chimney Fire Damage Assessment

CTLGroup evaluated fire damage in the chimney of a power plant while under construction.

See Project
↑Back to Top
Energy & Resources
Wind Tower Monitoring

Wind Tower Monitoring

CTLGroup performed foundation crack monitoring, load monitoring and frequency measurement at a Texas wind farm.

See Project
Coke Drum Support Evaluation

Coke Drum Support Evaluation

CTLGroup investigated the reinforced concrete frames supporting a refinery’s coke drums.

See Project
Hyperbolic Cooling Tower Rehabilitation

Hyperbolic Cooling Tower Rehabilitation

CTLGroup determined the extent and causes of the deterioration of cooling towers.

See Project
Chimney Fire Damage Assessment

Chimney Fire Damage Assessment

CTLGroup evaluated fire damage in the chimney of a power plant while under construction.

See Project
↑Back to Top
Green Solutions
Building Retrofit with Moisture-Related Problems

Building Retrofit with Moisture-Related Problems

Experts at CTLGroup performed an evaluation after roof leaks were reported around some skylights at a recently constructed indoor swimming pool in a Chicago suburb.

See Project
Life Cycle Inventory

Life Cycle Inventory

CTLGroup conducted an LCI of 3 concrete products: ready mixed, masonry & precast.

See Project
SRI of Concretes for LEED Sustainable Sites Credit

SRI of Concretes for LEED Sustainable Sites Credit

CTLGroup studied which combinations of concrete constituents will meet SRI requirements in LEED-NC Sustainable Sites credit for reducing the heat island effect.

See Project
Energy Efficiency Analysis

Energy Efficiency Analysis

CTLGroup examined energy savings and LEED points obtainable in mid-rise commercial buildings due to thermal mass of concrete.

See Project
↑Back to Top
Litigation & Insurance
I-35W Investigation and Expert Report

I-35W Investigation and Expert Report

CTLGroup was retained to provide expert opinion as to the cause of the collapse of the I-35W Bridge.

See Project
Big Dig Tunnel Ceiling Collapse

Big Dig Tunnel Ceiling Collapse

CTLGroup investigated the collapse of a panel in the Boston tunnel.

See Project
Hurricane Katrina Damage

Hurricane Katrina Damage

CTLGroup investigated storm damage to differentiate the effects of wind and surge.

See Project
Iowa City Tornado Damage

Iowa City Tornado Damage

CTLGroup conducted visual inspections of damaged properties for a major insurance carrier, resulting in a favorable settlement.

See Project
↑Back to Top
Materials & Products
Chicago Botanic Garden New Plant Science Center

Chicago Botanic Garden New Plant Science Center

CTLGroup revised concrete mix designs and developed construction details to avoid cracks in the floor.

See Project
Limiting Heights Analysis for Cold-Formed Steel Studs

Limiting Heights Analysis for Cold-Formed Steel Studs

CTLGroup engineers analyzed wall assembly test data provided by the client to determine the limiting wall heights for cold-formed steel stud and drywall assemblies.

See Project
Structural Concrete with Lightweight Synthetic Particles

Structural Concrete with Lightweight Synthetic Particles

CTLGroup worked with NOVA Chemicals to develop a new product for use in the production of lightweight concrete.

See Project
Sustainable Building Materials

Sustainable Building Materials

CTLGroup develops sustainable materials that can reduce the carbon footprint attributed to construction.

See Project
↑Back to Top
Transportation
Hale Boggs Memorial (Luling) Bridge Stay-Cable Replacement Design

Hale Boggs Memorial (Luling) Bridge Stay-Cable Replacement Design

CTLGroup prepared final design plans for the first-ever, complete stay-cable replacement project in North America.

See Project
Repaving JFK Airport Runway

Repaving JFK Airport Runway

CTLGroup involved in design, testing & batching of concrete for JFK runway repaving.

See Project
Slab Track Technology

Slab Track Technology

CTLGroup participates in the development of slab track in the U.S.

See Project
Dumbarton Rail Corridor Improvement

Dumbarton Rail Corridor Improvement

CTLGroup evaluated the concrete caissons of the Dumbarton and Newark Slough rail bridges in the San Francisco Bay.

See Project
↑Back to Top
Water & Wastewater
World's Largest Drainage Pumping Station

World's Largest Drainage Pumping Station

CTLGroup was involved in the construction of the New Orleans-based project.

See Project
Water Treatment Plants

Water Treatment Plants

Municipal facilities use a broad range of CTLGroup services.

See Project
Water Tank Analysis

Water Tank Analysis

High-level analysis of water tank components, providing value as a complete solutions provider.

See Project
Holtwood Dam

Holtwood Dam

A major powerstation required expert consulting, as CTLGroup partnered with a major contractor.

See Project
↑Back to Top
CTLGroup
  • Lab Services Center
  • Contact Us
  • Sign Up for CTLGroup Updates
  • Emergency Response 847-556-2670
  • About Us
    • Our People
    • Awards & Credentials
    • Careers
  • Markets & Services
    • Market & Services Overview

    Markets

    • Buildings & Facilities
    • Emergent Solutions
    • Energy & Resources
    • Green Solutions
    • Litigation & Insurance
    • Materials & Products
    • Transportation
    • Water & Wastewater

    Services

    • Consulting Services
    • Lab Services
  • Clients & Projects
  • News & Events
  • Insights
Search this site
  • Languages
  • English
  • Español

© 2013 CTLGroup. All Rights Reserved.

  • Site Map
  • Privacy Policy
  • Contact Us
Close
Search Project Archives
Select by Expertise
Enter a Date Constraint:
1972
2013
Keywords

(comma delineated names, descriptions, etc.)

Cancel
Thanks for your inquiry! We will get back to you soon.

Close this window.
Close

I'm interested in:

  • Privacy Policy
  • Cancel
Close

Specify sections to search under. Leave blank to search entire site:

Cancel